Should change Su Philippines Sugar daddy State actively deploys dynamic infrastructure

作者:

分類:

requestId:68629a96bdc487.41057466.

As early as 2016, the “Suzhou Construction International Dynamic Change and Development Model City Report” was released, which led to a good solution for how to crack the difficulty of power bottlenecks and other problems. This is China’s first model city construction report on international dynamic transformation and development, and is also recognized as the “global sample” of dynamic transformation. During the 13th Five-Year Plan period, Suzhou has vigorously built a number of first-class projects, leading technology, innovative equipment, and demonstration projects. The scale and distribution of power-based facilities are expanded, and the scale and density of power-based facilities are ranked first in the national prefecture city. It has built an annual throughput of 100 million yuan and the largest scale in the province. href=”https://philippines-sugar.net/”>Sugar babyNatural gas pipeline network system and the second largest urban network in the country.

When the appreciation of the whole country and even the world comes, Suzhou is actually in a tough battle: on the one hand, the self-reward rate of power supply is low, and on the other hand, the total amount of power consumption is huge, accounting for about 20% of the province’s total in 2020. As an economic market, Suzhou has a natural urgent need for a clean, low-carbon, safe and efficient modern urban dynamic system.

Now, Suzhou’s urban dynamic system has been building vigorously, digitally transformed, and jointly developed “two-leg walking”, actively creating an urban dynamic interconnection ecosystem, and specially depicting a clean, low-carbon, safe and efficient new urban landscape of international dynamic transformation.

In response to the transformation, we should actively deploy dynamic and basic new facilities

The hot summer, the Long Delta International R&D Community located in Gaozhi City, Suzhou, was launched. People enjoy the cleanliness of Sugar baby, and the entire park shared a “major air conditioning” covering an area of ​​750,000 square meters.

This new dynamic application method for centralized cooling comes from the start-up area power station. Compared with the traditional air conditioning external machines, it not only reduces the visual purification of the sports music and the facade of the building, but also has a high friendship with the space. The equipment and equipment of the power station only occupy 2‰ of the energy supply area, serving the business, office, hospital and office in the area.

The technical responsible person of the power station project introduced that the operation of this power station can reach more than 30 years in full operation cycle, and consider various business conditions in a comprehensive manner. Customer investment and operation prices can be accumulated by more than 20%. Compared with traditional household air conditioning, the centralized cooling method of the power station is more than 20% more effective, and it is doubled for environmental protection and stability. On the user’s side, the water temperature in the pipeline can be kept at 10℃ to ensure the room temperature is comfortable. It is supplied for 9 months of heat supply and cooling, and the indoor temperature is 18±2℃ and 26±2℃. According to Suzhou’s climate characteristics this year, the current scheduled cooling time for the power station is from mid-May to mid-October, and the heating time is from mid-November to mid-March of the following year.

Sugar baby, general manager of Suzhou High-Electricity Co., Ltd., introduced that today, the launch district power station has built a smart cloud platform, through the Internet of Things, data, artificial intelligence and other technologies. Baby‘s technology can not only monitor the normal operation of the equipment machine, but also clearly understand the application situation of each area in the startup area, so as to achieve intelligent control of energy flow and achieve efficient and efficient application of power.

The power station is successfully put into use and cannot be fully supported by the municipal and power supply departments. The power station operation unit adopts the “centered water chiller unit + municipal heat pipe network” technology, and has been fully connected to the power, heat and water supply pipe network. Suzhou Gaoxin City Power Company, which is responsible for the construction and operation of the power station project, has cooperated with the Suzhou Power Supply Company, a national energy-saving contract power management method, so that the current energy-saving energy benefits are the most significant.

According to the planning, Suzhou Gaoteng New City will “open horsepower” to build multiple regional power stations throughout the entire region, designed, constructed and operated by Suzhou Gaoteng New City Power Co., Ltd., and adopt multiple power (electricity, steam, combustion, solar energy, air energy, reclaimed water, dual energy storage, etc.) at any time, and set up installation capacity, high energy efficiency, and main cooling. escortThermal machine system is intelligently controlled and centrally supplies cooling and heat to the building complex through the pipeline network. After all construction and investment, it is expected that the annual coal tax rate will be approximately 510 million tons, the carbon dioxide emissions will be reduced by approximately 127,000 tons, and the electricity consumption will be approximately 140 million degrees.

In Tongli Town, Wujiang District, the low-carbon career scenes are all about: Opening a new businessPower cars, electric ferry, and walking on the road are all wind energy lights… In 2020, this thousand-year-old town’s power supply has been completely cleaned and intelligent, becoming a real new dynamic town.

In the current situation of frequent urban space trends and continuous growth in development demand, Suzhou has explored the sharing application of dynamic basic facilities resource, and improved the effectiveness of urban basic facilities and urban space application, such as strengthening the industrial park. Cooling, heat and electricity comprehensive dynamic planning, comprehensive dynamic stations in the commercial service area and the innovative New Zealand and the road and river construction areas will strengthen the coupling integration and mutual application of power production such as light, electricity, air, cooling and heat, so as to make economic benefits unified and social benefits unified.

Relevant responsible persons of the Suzhou Municipal Development and Reform Commission introduced that the city will promote the connection between dynamic planning and economic society, dynamic “dual control”, domestic space, energy and environmental protection, ecological civilization, urban safety and other plans, promote the coordination and integration of dynamic infrastructure with urban public facilities such as 5G and underground management networks, and optimize the application of urban space. In terms of strengthening target governance, Suzhou implements the three-level target responsibility system of cities, districts and key energy consumption units in accordance with the relevant mechanisms of the country and province, and implements the total control task differentiation mechanism, total control mechanism and inspection mechanism of the city, district, and key energy consumption units.

Diven and low-carbon, Suzhou has continuously optimized the new system of power supply for power supply

Sugar babyAverage annual career power consumption in Suzhou people ranks in the country’s cities – it has been frequently criticized. 3. The power supply ranks second in the country, and the industrial power consumption ranks first among all cities in China. The total capacity of the machine and distributed photovoltaic power generation engine capacity rank first in Jiangsu. While supplying strong power guarantees, the proportion of cleaning power continues to rise.

“Suzhou’s electricity replacement capacity is biting cold in the province, and the snow in the community has not melted. The scope is the largest and has the highest proportion, and the investment and construction and promotion demonstration projects have the largest number of projects, and the largest number of projects.” The staff of Suzhou Power Supply Company of the National Suzhou Power Supply Company said that as a municipal-level company that participates in the National Energy Supply Company of the National Suzhou Company, SuSugar babyThe State Power Supply Company has taken root in 13 demonstration projects in urban supporting facilities, industrial enterprises, ecological games, and commonplaces.

The dynamic replacement project has responded to the actual needs of modern enterprise development, promoted the company’s purpose of leap towards green, low-carbon and environmental protection, and has become a dynamic transformation script for Suzhou. Fancheng’s ineffectiveness has a certain demonstration effect on promoting the dynamic changes in the province and even the whole country.

Supers cannot leave their seats. “The state promotes the dynamic changes not by passively, but by relying heavily on industry advantages, planning for the layout of new dynamic industries, and working in all aspects in the development of equipment and automobile manufacturing, power, environmental protection and other fields.

Hydraulic energy is a new and clean, efficient, safe and sustainable force. The hydropower ind TC:


留言

發佈留言

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *